检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Liang Lu Mingkui Wei Yuxuan Tao Qing Wang Yuxiao Yang Chuan He Haonan Zhang
机构地区:[1]Southwest Branch of State Grid Corporation of China,Chengdu 610065,P.R.China [2]College of Electrical Engineering,Sichuan University,Chengdu 610065,P.R.China
出 处:《Global Energy Interconnection》2024年第1期25-37,共13页全球能源互联网(英文版)
基 金:supported by Science and Technology Project of SGCC(SGSW0000FZGHBJS2200070)。
摘 要:With the increasing penetration of wind and solar energies,the accompanying uncertainty that propagates in the system places higher requirements on the expansion planning of power systems.A source-grid-load-storage coordinated expansion planning model based on stochastic programming was proposed to suppress the impact of wind and solar energy fluctuations.Multiple types of system components,including demand response service entities,converter stations,DC transmission systems,cascade hydropower stations,and other traditional components,have been extensively modeled.Moreover,energy storage systems are considered to improve the accommodation level of renewable energy and alleviate the influence of intermittence.Demand-response service entities from the load side are used to reduce and move the demand during peak load periods.The uncertainties in wind,solar energy,and loads were simulated using stochastic programming.Finally,the effectiveness of the proposed model is verified through numerical simulations.
关 键 词:Hydro-wind-solar complementary Expansion planning Demand response Energy storage system Source-network-demand-storage coordination
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.151.104