检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴西奇 刘畅[1] 李睿[1] 姜新宇 余东旭 陆承宇 裘鹏 丁超 蔡旭[1] WU Xiqi;LIU Chang;LI Rui;JIANG Xinyu;YU Dongxu;LU Chengyu;QIU Peng;DING Chao;CAI Xu(Key Laboratory of Control of Power Transmission and Conversion,Ministry of Education(Shanghai Jiaotong University),Minhang District,Shanghai 200240,China;Guangzhou Zhiguang Energy Storage Technology Co.,Limited,Guangzhou 510765,Guangdong Province,China;Contemporary Amperex Technology Co.,Limited,Ningde 352106,Fujian Province,China;State Grid Zhejiang Electric Power Co.,Ltd.Electric Power Research Institute,Hangzhou 310000,Zhejiang Province,China)
机构地区:[1]电力传输与功率变换控制教育部重点实验室(上海交通大学),上海市闵行区200240 [2]广州智光储能科技有限公司,广东省广州市510765 [3]宁德时代新能源科技股份有限公司,福建省宁德市352106 [4]国网浙江省电力有限公司电力科学研究院,浙江省杭州市310000
出 处:《中国电机工程学报》2024年第4期1406-1418,I0013,共14页Proceedings of the CSEE
摘 要:高压直挂电池储能系统(battery energy storage system,BESS)采用H桥电路串联的方法升高电压后接入电网,将电池簇分散接入级联H桥变换器的直流侧,具有高度模块化的结构,对比低压方案具有单机容量大、效率高、响应速度快等明显优势。高压直挂BESS若能兼具无功补偿能力,实现系统四象限运行,将具有更大的成本优势和经济效益。电池簇接单相H桥变换器的结构,使得系统运行在高比例无功补偿工况时,电池簇电流在一个二倍基频的周期中会出现两次反向,导致电池运行在高频充放电的工况,这会对电池寿命和电池状态监测造成较大的影响。为解决这一问题,提出一种基于零序电压注入的高比例无功补偿控制方法,避免了二倍基频脉动电流对电池进行高频充放电,再通过优化零序电压的幅值和相位,最大程度上降低对电池的影响。The high-voltage transformer-less battery energy storage system(BESS)adopts the concept of cascading H-bridge circuits to connect the high voltage power grid.A large number of battery cells are separated equally into numerous clusters at the DC side of H-bridge submodules,and a high degree of modularity features the BESS.Compared with the low-voltage solution,it has obvious advantages such as larger capacity of single-machine,higher efficiency,and faster response speed.If the high-voltage transformer-less BESS also has reactive power compensation capabilities and can realize the four-quadrant operation of the system,greater cost advantages and economic benefits will be obtained.When the system operates at a high proportion of reactive power compensation,the structure of the battery cluster connected to the single-phase H-bridge converter results in that the battery current will reverse in a cycle of twice the fundamental frequency.The battery is charged and discharged with high frequency,which will have a great impact on battery life and battery status monitoring.To solve this problem,this paper proposes a high-proportion reactive power compensation control based on zero-sequence voltage injection and the charged and discharged current with twice the fundamental frequency is removed.Besides,the amplitude and phase of the zero-sequence voltage are optimized to minimize the impact on the battery.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.173.146