检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张葛军 ZHANG Gejun(Longyuan Power Group Co.,Ltd.,Beijing 100034,China)
出 处:《风力发电》2023年第6期42-49,共8页Wind Power
摘 要:从长远发展的角度来讲,风电工程项目具有较高的应用价值,既可以满足日益提高的用电需求,又可以解决能源问题、环境问题、经济问题等,促进我国发展的良性循环。所以,相关责任企业应高度重视现浇混凝土风机塔筒及基础建设存在的不足,不断优化施工技术,规范化、合理化、有效化地进行混凝土塔筒制作与安装,提高其稳固性、安全性及耐用性,满足实际应用需求。本文将从概述风电项目现浇混凝土风机塔筒的发展趋势展开,着重分析现浇混凝土风机塔筒制作与安装施工。From the perspective of long-term development,wind power engineering projects have a high application value,that is,to meet the increasing demand for electricity,but also to solve energy problems,environmental problems,economic problems,etc.,to promote China's good development.Therefore,the relevant responsible enterprises should attach great importance to the shortcomings of cast-in-place concrete fan tower and infrastructure,constantly optimize the construction technology,standardize,rationalize and effectively carry out the production and installation of concrete tower barrel,improve its stability,safety and durability,and meet the needs of practical applications.The following article will summarize the development trend of cast-in-place concrete fan tower in wind power projects,focusing on the analysis of cast-in-place concrete fan tower production and installation construction.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33