检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邵俐[1] 李闯 蒙强 李佩青 SHAO Li;LI Chuang;MENG Qiang;LI Peiqing(School of Environment and Architecture,University of Shanghai for Science and Technology,Shanghai 200093,China;Construction Project Headquarters of Guangxi Airport Management Group,Nanning 530034,China)
机构地区:[1]上海理工大学环境与建筑学院,上海200093 [2]广西机场管理集团建设工程指挥部,南宁530034
出 处:《上海理工大学学报》2024年第1期69-77,共9页Journal of University of Shanghai For Science and Technology
基 金:国家自然科学基金资助项目(42177145)。
摘 要:为研究飞机起飞对隧道施工过程中地表沉降的影响,依托某机场隧道工程实例,利用MIDAS GTS NX软件进行数值模拟,分析了飞机荷载对单线隧道和双线隧道地表沉降的影响规律。研究结果表明,飞机由单线隧道左侧滑行至右侧时,地表沉降最大值由左侧移至中间偏右位置,且最大值不断增大。飞机滑行经过双线隧道工程上方时,地表沉降最大值由先行隧道上方逐渐转移至后行隧道上方;当飞机经过两隧道中间滑行至后行隧道拱肩上方时,地表沉降值最大且超过30 mm。单线隧道和双线隧道的最大沉降均位于拱顶位置处,向周围方向沉降值逐渐减小,因此,在施工过程中,除了应定时进行监测外,需重点关注拱顶处沉降情况,保证施工安全。This study investigated the impact of aircraft take-off on the surface subsidence during the construction of an airport tunnel project with the numerical simulation.The change rule of surface subsidence of single-track tunnel and double-track tunnel caused by the aircraft position under plane load was analyzed through MIDAS GTS NX software.The results demonstrated that,the surface subsidence in a single-track tunnel moved from the left side to the middle of the right side when an aircraft glided from left to right and the maximum value of surface subsidence continued to increase.In the double-track tunnel,the maximum surface subsidence gradually transferred from the top of the first tunnel to the top of the followed tunnel.When the aircraft load was positioned above the arch shoulder of the tunnel behind and passed through the middle of two tunnels,the maximum surface settlement value exceeded 30 mm.The maximum settlements of both single-track and double-track tunnels were located at the vault,with a gradual decrease in settlement value towards the surrounding areas.Those findings suggest that regular monitoring of the construction is essential to ensure the safety during the construction process,especially for the settlement of the vault.
关 键 词:飞机荷载 单线隧道 双线隧道 地表沉降 数值模拟
分 类 号:U455[建筑科学—桥梁与隧道工程] TU433[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.136.160