检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邸向荣 李斌斌 张睿栋 张世娟 DI Xiangrong;LI Binbin;ZHANG Ruidong;ZHANG Shijuan(Sinohydro Bureau 5 Co.,LTD.,Chengdu Sichuan 610066)
机构地区:[1]中国水利水电第五工程局有限公司,四川成都610066
出 处:《四川水力发电》2024年第1期54-56,60,共4页Sichuan Hydropower
摘 要:笔者依据岷江犍为航电枢纽工程,阐述了在其厂房5号和9号机组闸墩部位设计的2个应力与温度监测断面,在闸墩混凝土浇筑施工期间安装了应变计及温度计并进行了长时间不间断监测,根据所收集到的监测数据和成果计算对混凝土应力应变及温度在季节性变化中的实际量值进行分析的过程。In the Qianwei Navigation-Power Junction on Minjiang River,two stress and temperature monitoring sections were designed at the sluice piers of Units 5#and 9#of the powerhouse.During the concrete pouring construction of the sluice piers,strain gauges and thermometers were installed and carried out continuous monitoring for a long time.The actual values of concrete stress,strain and temperature in seasonal changes were analyzed according to the collected monitoring data and calculation results.
分 类 号:TV7[水利工程—水利水电工程] TV544TV43TV52
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.96.245