检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵宇阳 ZHAO Yuyang(CCHN ENERGY Dadu River Dagangshan Power Generation Co.,Ltd,Shimian Sichuan 625409)
机构地区:[1]国能大渡河大岗山发电有限公司,四川石棉625409
出 处:《四川水力发电》2024年第1期143-146,共4页Sichuan Hydropower
摘 要:水电站工程剩余物资多由基建单位因各种原因产生,工程建设中有一定数量的剩余物资现象普遍存在。笔者对工程剩余物资在由基建交付电力生产后存在的问题展开了思考,同时结合财务和审计角度提出了相应的解决措施;为已接收工程剩余物资的电力生产单位在处理工程剩余物资的方面提供了一定的借鉴意义。The surplus materials of hydropower station projects are mostly produced by the capital construction unit for various reasons,and it's common that there are a certain number of surplus materials in the construction of the project.The problems of the surplus materials of the project after being delivered from the capital construction to the power production are considered,and the corresponding solutions are put forward from the perspective of finance and audit in this paper.It provides a certain reference for the power production units that have received the project surplus materials when dealing with the project surplus materials.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38