检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李朋宇 Li Pengyu(Zhengzhou Coal Group Engineering Technology Research Institute,Henan Zhengzhou 450042)
机构地区:[1]郑煤集团工程技术研究院,河南郑州450042
出 处:《山东煤炭科技》2024年第1期82-85,共4页Shandong Coal Science and Technology
摘 要:郑州煤业集团告成煤矿底抽巷道围岩软弱易碎,受地应力影响强烈,导致抽采钻孔塌孔频发。为了减少抽采钻孔变形破坏,提高瓦斯抽采效率,通过数值模拟方法对不同水平应力影响下底抽巷道围岩变形破坏特征进行分析,利用钻孔成像轨迹检测装置对钻孔变形与裂纹分布进行检测。结果表明:在抽采孔布孔时需充分考虑水平应力影响,避开高水平应力区域及巷道顶板中心等应力集中区域,以提高抽采钻孔稳定性。The surrounding rock of the bottom extraction roadway in Gaocheng Coal Mine of Zhengzhou Coal Industry Group is weak and fragile,and is strongly affected by ground stress,resulting in frequent hole collapse of extraction drilling holes.In order to reduce the deformation and damage of extraction drilling holes and improve the efficiency of gas extraction,numerical simulation methods are used to analyze the deformation and damage characteristics of the surrounding rock of the bottom extraction roadway under different horizontal stress influences.The drilling hole imaging trajectory detection device is used to monitor the drilling holes deformation and cracks distribution.The results indicate that the influence of horizontal stress should be fully considered when arranging holes for extraction,avoiding stress concentration areas such as high horizontal stress areas and the center of the roadway roof,in order to improve the stability of extraction drilling holes.
分 类 号:TD712.6[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248