作 者:冀斌 Ji Bin(State Nuclear Power Plant Service Co.,Ltd.,Shanghai 200233,China)
机构地区:[1]国核电站运行服务技术有限公司,上海200233
出 处:《发电设备》2024年第2期109-114,共6页Power Equipment
摘 要:基于某核电厂压水反应堆蒸汽发生器传热管的焊接堵管案例,根据2021年版ASME BPVC规范,主要从堵头材料、焊接材料、焊接工艺评定、堵管工艺操作技术等方面进行分析,以确保压水反应堆蒸汽发生器传热管焊接堵管工艺的有效性。采用经评定合格的堵管工艺,对该核电厂蒸汽发生器的破损传热管进行堵管,蒸汽发生器投用后未再发生泄漏,堵管效果良好。研究结果为国内核电厂蒸汽发生器传热管破损后焊接堵管工艺提供了技术参考。Based on a case of the welding and plugging of steam generator heat transfer tube of a pressurized water reactor in a nuclear power plant,in accordance with the 2021 edition of ASME BPVC,analyses were conducted from the aspects of plugging head material,welding material,welding procedure qualification,and plugging procedure techniques,so as to ensure the effectiveness of the tube welding and plugging procedure.Through using a qualified tube plugging procedure,the damaged heat transfer tube of steam generator in the nuclear power plant was plugged.There is no leakage occurring in steam generator after plugging during normal operation,which demonstrates the successful effectiveness of the tube plugging.The results provide technical references for the welding and plugging procedure of steam generator heat transfer tube after damage in domestic nuclear power plants.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.23.30