检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡海晓 朱继彬 裴建家 李颖 HU Haixiao;ZHU Jibin;PEI Jianjia;LI Ying(Shandong Provincial Communications Planning and Design Institute Group Co.,Ltd.,Ji’nan 250101,China)
机构地区:[1]山东省交通规划设计院集团有限公司,山东济南250101
出 处:《中国高新科技》2024年第2期60-62,共3页
摘 要:为研究预压期对软土地基沉降的影响,文章以日照(岚山)至菏泽公路枣庄至菏泽段工程项目为依托,分别在微山湖东侧和西侧各选取一个断面,计算有预压期和无预压期2种工况下的地基沉降,最终得出了预压期对软土地基沉降的影响规律。In order to study the influence of preloading period on the settlement of soft soil foundation,based on the project from Zaozhuang to Heze section of Rizhao(Lanshan)to Heze Highway,this paper selects a section on the east and west sides of Weishan Lake,respectively to calculate the post-construction settlement of foundation under two working conditions:preloading period and no preloading period.Finally,this paper points out the influence of preloading period on the settlement of soft soil foundation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112