检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭佳强 GUO Jiaqiang(Power Construction Corporation of China Chongqing Engineering Co.,Ltd.,Chongqing 400050,China)
机构地区:[1]中国电建集团重庆工程有限公司,重庆400050
出 处:《通信电源技术》2024年第1期28-30,共3页Telecom Power Technology
摘 要:文章提出了用于新能源电力系统自动发电控制(Automatic Generation Control,AGC)的实时调频容量评估方法,以满足控制区的自动发电控制调频能力分析需求。根据AGC调频容量考核标准,整理了影响调频容量的主要因素,并运用历史数据预测调频标准差。以贵州黔源电力镇宁某水电站和光伏站作为例,评估AGC调频容量。实验结果证实,应用所提方法能有效地分配调频容量。This paper proposes a real-time frequency modulation capacity evaluation method for Automatic Generation Control(AGC)of new energy power system,so as to meet the demand for frequency modulation capacity analysis of AGC in the control area.According to the assessment standard of AGC frequency modulation capacity,the main factors affecting frequency modulation capacity are sorted out,and the frequency modulation standard deviation is predicted by using historical data.Taking a hydropower station and photovoltaic station in Zhenning of Guizhou Qianyuan Electric Power Company as an example,the frequency modulation capacity of AGC is evaluated.The experimental results show that the method proposed in this paper can effectively allocate frequency modulation capacity.
关 键 词:新能源电力系统 自动发电控制(AGC)调频 容量监测
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63