高性能无机注浆材料在“孤岛”工作面巷道加固中的应用  

Application of High Performance Inorganic Grouting Material in Roadway Reinforcement of"Isolated Island"Working Face

在线阅读下载全文

作  者:赵建阳 Zhao Jianyang(Coal Science and Technology Research Institute Co.,Ltd.,Beijing 100013,China)

机构地区:[1]煤炭科学技术研究院有限公司,北京100013

出  处:《山西化工》2024年第2期159-161,共3页Shanxi Chemical Industry

摘  要:为保证“孤岛”工作面巷道顶板和煤柱结构稳定性,针对工作面两巷在回采过程中受到叠加动压影响,变形严重的问题,采取注浆加固措施,使用硫铝酸盐水泥熟料与生石灰、石膏等材料作为主要注浆原材料进行配比,加入添加剂后改良其可塑性及抗压强度,经过实践验证,加固后,巷道两帮移近量217.5~252.6 mm,顶底移近量达212.3~239.4 mm,巷道变形情况得到控制。In order to ensure the structural stability of roadway roof and coal pillar in isolated working face,aiming at the problem of serious deformation caused by superimposed dynamic pressure in the mining process of two working face alleyways,grouting reinforcement measures are adopted.Sulfoaluminate cement clinker,quick lime,gypsum and other materials are used as the main grouting raw materials for matching,and additives are added to improve its plasticity and compressive strength.After reinforcement,the nearness of the two sides of the roadway is 217.5~252.6 mm,and the nearness of the top and bottom reaches 212.3~239.4 mm.The deformation of the roadway is controlled.

关 键 词:“孤岛”工作面 动压影响 注浆加固 巷道变形 

分 类 号:TD265.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象