检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢小伟 Xie Xiaowei(CHN Energy Shendong Shigetai Coal Mine,Yulin Shaanxi 719000,China)
机构地区:[1]国家能源神东石圪台煤矿,陕西榆林719000
出 处:《山西化工》2024年第2期171-173,共3页Shanxi Chemical Industry
摘 要:为了解决二次扰动下巷道围岩变形大的问题,通过数值模拟对注浆支护方案下巷道围岩变形量进行分析,在得出最佳注浆加固方案后进行工业化试验,试验发现巷道的顶底板变形量最大值为294 mm,两帮的移近量最大值为417 mm,能够满足矿井开采的要求,为矿井二次扰动巷道安全开采提供一定的依据。In order to solve the problem of large deformation of roadway surrounding rock under secondary disturbance,the deformation of roadway surrounding rock under the grouting support scheme is analyzed through numerical simulation.After obtaining the best grouting reinforcement scheme,the industrial test is carried out.It is found that the maximum deformation of roadway top and floor is 294 mm,and the maximum displacement of two sides is 417 mm.It can meet the requirements of mine mining and provide a certain basis for the safe mining of secondary disturbance roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15