接触网基础及钢柱损伤处置技术方案研讨  

Discussion on Technical Scheme for Managing Damage to Foundation and Mast of Overhead Contact System

在线阅读下载全文

作  者:李军 倪俊琪 LI Jun;NI Junqi(China Railway Chengdu Group Co.,Ltd.,Chengdu 610000,China)

机构地区:[1]中国铁路成都局集团有限公司,成都610000

出  处:《高速铁路技术》2023年第6期32-34,56,共4页High Speed Railway Technology

摘  要:随着我国电气化铁路的迅速发展,铁路运营对接触网的要求越来越高。当突发事故对接触网设备造成损坏,尤其是接触网钢柱基础损坏,会给应急抢修工作造成极大的困难。本文探讨了某次应急抢险中对损坏的接触网钢柱基础所采取的临时措施和恢复方案,并提出了优化基础设计方案建议,研究成果可为今后出现同类情况提供参考。With the rapid development of electrified railways in China,the requirements for overhead contact systems in railway operations are becoming increasingly high.Any unexpected incidents causing damage to the equipment of overhead contact system,especially if the foundation of the overhead contact system’s masts is damaged,will pose significant challenges for emergency rescue.This paper discussed the temporary measures and recovery scheme implemented in an emergency rescue for damaged mast foundation of the overhead contact system,and proposed suggestions for optimizing the foundation design.The results of this study can provide a reference for dealing with similar situations in the future.

关 键 词:接触网 钢柱基础 抢修 措施 

分 类 号:U216.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象