检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王伟 WANG Wei(Jiangsu East China Engineering Design Co.,Ltd,Nanjing Jiangsu210007China)
机构地区:[1]江苏华东工程设计有限公司,江苏南京210007
出 处:《江苏建筑》2024年第1期107-110,共4页Jiangsu Construction
摘 要:文章以商洛地区强透水层基坑锚索及基础结构预应力抗浮锚索的成功实施为背景,针对锚索实施过程中可能涉及的降水及外围沉降变形进行计算分析,采取合理布置降水井、动态调整降水方式、改进锚索成孔及注浆工艺等技术手段,建立各参建单位联动协调机制,信息化施工,确保了基坑锚索及基础结构预应力抗浮锚索的成功实施并达到设计要求,满足工程需要,为类似工程提供参考与借鉴。This paper took the successful implementation of foundation pit anchor cables and foundation structure prestressed anti floating anchor cables in the strong permeable layer of the Shangluo area as the background.It calculated and analyzed the possibld precipitation and peripheral settlement deformation involved in the anchor cable implementation process.Technical measures such as reasonable arrangement of precipitation wells,dynamic adjustment of precipitation methods,improvement of anchor cable drilling and grouting technology were adopted,and a linkage and coordination mechanism among various participating units was established for information sharing,ensuring the successful implementation of foundation pit anchor cables and foundation structure prestressed anti floating anchor cables,meeting design requirements,meeting engineering needs,and providing guidance for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38