作 者:唐华[1] TANG Hua(China Railway Eighth Bureau Group First Engineering Co.,Ltd.,Chongqing 400053,China)
机构地区:[1]中铁八局集团第一工程有限公司,重庆400053
出 处:《价值工程》2024年第7期62-64,共3页Value Engineering
摘 要:某钢管混凝土系杆拱桥主跨100m,采用先梁后拱法。结合施工现场情况,钢管拱采用吊装配合支架法安装施工。文章重点介绍了钢管拱节段划分、吊装设备选用、临时支架设计、安装步骤、线性控制等内容,可为类似条件下的系杆拱桥钢管拱安装施工提供参考。A steel tube concrete tied arch bridge with a main span of 100m is constructed using the beam first and then arch method.Based on the construction site conditions,the steel pipe arch is installed using the lifting and supporting method.The article focuses on the division of steel pipe arch segments,selection of lifting equipment,design of temporary supports,installation steps,linear control,etc.,which can provide reference for the installation and construction of steel pipe arches in tied arch bridges under similar conditions.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43