检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曾懿 ZENG Yi(China Energy Engineering Group Guangxi Electric Power Design Institute Co.,Ltd.,Nanning 530007,China)
机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007
出 处:《红水河》2024年第1期13-16,共4页Hongshui River
摘 要:尼泊尔某水电站所处河流属于较为典型的高含沙量河流,该电站为调峰径流(PRoR)式高水头电站,防沙排沙尤为重要。笔者研究了以库代池方案的可行性和经济性,结合水文泥沙运行数值分析结果,采取较为合理的冲排沙设计及机组抗磨蚀措施,节省工程投资。该研究可为其他类似工程设计提供参考。The river where a hydropower station is located in Nepal is a typical river with high sediment concentration.The power station is a peak-shaving runoff(PRoR)high-head power station,and sand prevention and sediment discharge are particularly important.The authors studied the feasibility and economy of the replacing desilting basin with reservoirs scheme,combined with the numerical analysis results of hydrological and sediment operation,adopted a more reasonable flushing and desilting design and anti erosion measures for the unit to save engineering investment.This study can provide reference for other similar engineering design.
分 类 号:TV747[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185