检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王珊 WANG Shan(Shanghai Jianhao Engineering Consultancy Co.,Ltd.,Shanghai 200030,China)
出 处:《建筑施工》2024年第3期330-332,共3页Building Construction
摘 要:城市更新并非简单的拆改新建,其核心已经扩展到城市空间形态、功能体系及产业结构的整治和提升等方面。此类项目存在投资金额大、工期长、不确定因素多等难题。通过对实际案例的分析,确定全过程造价管理的目标,找到全过程造价管理应用的方法和要点,为类似工程提供参考。Urban renewal is not a simple demolition,renovation and new construction,and its core has been extended to the rectification and improvement of urban spatial form,functional system and industrial structure.There are many problems in such projects,such as large investment,long construction period and many uncertain factors.Through the analysis of the actual case,the goal of the whole process cost management is determined,and the methods and key points of the whole process cost management application are found,which can provide reference for similar projects.
分 类 号:TU71[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147