检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘超[1] 袁广 李浩哲 刘亮[1] 孙四清 彭煜敏 LIU Chao;YUAN Guang;LI Haozhe;LIU Liang;SUN Siqing;PENG Yumin(Huainan Mining Group Coalbed Methane Development and Utilization Co.,Ltd.,Huainan 232000,China;CCTEG Xi′an Research Institute(Group)Co.,Ltd.,Xi′an 710077,China)
机构地区:[1]淮南矿业集团煤层气开发利用有限责任公司,安徽淮南232000 [2]中煤科工西安研究院(集团)有限公司,西安710077
出 处:《煤炭技术》2024年第2期166-170,共5页Coal Technology
摘 要:针对淮南矿区碎软低渗煤层瓦斯抽采技术难题,以13-1煤层为例,在分析煤层及其顶底板概况的基础上,采用煤层顶板分段压裂水平井技术,充分利用水平井水平段,单段分3簇射孔,簇间距25 m,实现分段多簇密切割体积压裂改造。微地震监测结果表明,单段裂缝长度102.5~211.4 m,缝高17.3~27 m,裂缝主体向下延伸,实现了井筒与煤层的沟通。排水采气效果表明,最高产气量1519 m^(3)/d,取得了良好的产气效果。研究成果为淮南矿区煤层气地面预抽和瓦斯区域治理提供了工程借鉴。Aiming at the technical problem of coalbed methane(CBM)extraction of broken-soft coal seamsin Huainan mining area,taking 13-1 coal sem as an example,based on the analysis of the general situation of target coal seam and its roof and floor,the staged fracturing technology of horizontal well in coal seam roof is applied.And the horizontal section of horizontal well is fully utilized.There are three clusters in each stage,and the cluster spacing is 25 m,so as to realize the staged multicluster dense-cutting volume fracturing stimulation of coal seam.The microseismic monitoring results show that the length of single-stage fracture is between 102.5 m and 211.4 m,the height is between 17.3 m and 27.0 m.The main fracture extends downward and the communication between wellbore and coal seam is realized.The effect of drainage gas recovery shows that the maximum daily gas production is 1519 m3/d,and good gas production effect was achieved,which provides engineering reference for ground pre-drainage of coalbed methane and regional gas control in Huainan mining area.
关 键 词:分段多簇密切割压裂 煤层顶板水平井 淮南矿区 煤层气 微地震监测
分 类 号:TD712.6[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.23.86.150