检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王勇 刘梦晨 王辉 师文 岳园园 罗璇 秦博宇 WANG Yong;LIU Mengchen;WANG Hui;SHI Wen;YUE Yuanyuan;LUO Xuan;QIN Boyu(Research Institute of Economics and Technology,State Grid Shaanxi Electric Power Co.,Ltd.,Xi’an 710065,China;School of Electrical Engineering,Xi’an Jiaotong University,Xi’an 710049,China)
机构地区:[1]国网陕西省电力有限公司经济技术研究院,陕西西安710065 [2]西安交通大学电气工程学院,陕西西安710049
出 处:《电工电能新技术》2024年第3期73-82,共10页Advanced Technology of Electrical Engineering and Energy
基 金:国网陕西省电力有限公司2022年度发展专题(SGSNJY00GPJS2201517)。
摘 要:为应对日趋严峻的气候问题,中国提出了“双碳”战略目标,能源低碳转型已成为共识。配电系统在可再生能源消纳和用户侧减排方面发挥着重要作用,同时面临新的挑战。城市作为能源消耗的中心,具有显著的聚集碳排效应,城市配电网的低碳转型需求迫切。本文首先提出了计及源网荷储协同运行的城市配网侧储能系统框架。其次,考虑储能系统各项成本,构建储能容量配置模型。进而,计及系统中储能运行、配电网潮流约束等条件,目标为系统运行成本最低,构建系统优化调度模型。最后,计及储能容量配置与源网荷储协同调度运行,构建规划-运行双层优化模型,并通过算例验证本文所提优化配置方案的有效性。In order to cope with the increasingly severe climate change problem,China has put forward the“double carbon”target,and energy low-carbon transformation has become a global consensus.While the distribution system plays an important role in promoting accommodation of renewable energy and reduction of users'carbon emission,it will also face new challenges.As the center of energy consumption,cities have significant carbon emission effect,so the low-carbon transformation of urban distribution network is in urgent need.Firstly,the framework of urban distribution network side energy storage system considering the cooperative operation of source network load storage is proposed.Secondly,the capacity optimization configuration model of energy storage system is established,considering the cost of energy storage system in the whole life cycle.Thirdly,a system optimization scheduling model is established considering the constraints such as energy storage and power flow in the distribution network,and aiming at the lowest comprehensive operation cost of the system.Finally,a dual-layer optimization model of planning-operation is constructed,considering the capacity optimization of the energy storage system and the optimal scheduling of the load-storage cooperative operation system of the source network,and the effectiveness of the proposed optimal configuration scheme is verified by a numerical example.
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.175.32