检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王磊[1] WANG Lei(Xinjiang Water Conservancy and Hydropower Survey and Design Research Institute CO.LTD.,Urumqi 830000,China)
机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830000
出 处:《河南水利与南水北调》2023年第12期71-72,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:文章根据金沟河流域水利枢纽坝址区地质条件,提出上、下坝址两个比选方案,从地形地质条件、枢纽布置、施工条件、运行管理条件、工程投资等方面对两个坝址进行综合技术经济比较,结果表明,上、下坝址相距较近,地质条件基本相同,上下坝址均具备建坝条件,但下坝址具有枢纽布置相对合理、投资较省的优点,比选方案可为类似工程提供参考。According to the geological conditions of the dam site area of the Jinguou River Basin Water Conservancy Project,two comparison schemes of the upper and lower dam sites are put forward in this paper.A comprehensive technical and economic comparison of the two dam sites is made from the aspects of topographic and geological conditions,key layout,construction conditions,operation and management conditions,engineering investment,etc.The results show that the upper and lower dam sites are close to each other,and the geological conditions are basically the same.Both the upper and lower dam sites have the conditions for dam construction.However,the lower dam site has the advantages of relatively reasonable layout of key points and low investment.The comparison scheme can provide reference for similar projects.
分 类 号:TV62[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.226.15