检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王春江 Wang Chunjiang(Guizhou Geological Exploration Institute of China Chemical Geology and Mine Bureau,Guiyang,Guizhou,550002,China)
机构地区:[1]中化地质矿山总局贵州地质勘查院,贵州贵阳550002
出 处:《化工矿产地质》2023年第4期373-378,共6页Geology of Chemical Minerals
摘 要:随着时代的发展和社会的进步,除传统化工行业以及农业两个方面对磷矿的大量需求外,新能源产业对磷矿资源的需求也急剧增加,导致磷矿开采质量及产量备受关注。由于目前磷矿开采逐渐由露天开采向深部开采转变,导致开采过程中的难度及成本增大,因而竖井的作用在磷矿开采中也变得越来越重要。对于竖井,施工前需进行专项的地质勘察工作,并针对磷矿山竖井施工过程地下水及不良地质作用需采取有效防治措施,保证工程质量及施工安全。基于此,本文以实际工程为例,对磷矿山竖井施工地质勘察工作展开详细探讨,并对磷矿山竖井水害及不良地质作用点综合防治措施深入分析,以供参考。With the development of The Times and the progress of society,in addition to the large demand of phosphorite in two aspects of the traditional chemical industry and agriculture,the current new energy industry demand for phosphate rock resources has increased sharply,at present,the quality and output of phosphate rock mining is concerned by the state.However,due to the transition of phosphate mining from mining openly to deep mining,the difficulty and cost in the mining process increase,so the role of mineshaft is becoming more and more important in phosphate mining.For the mineshaft,scientific geological reconnaissance should be carried out before construction,and effective prevention and control measures should be taken for groundwater and adverse geological effects in the construction process of phosphate mine mineshaft,so as to guarantee the construction quality of the project and engineering safety.Based on this,this paper takes the actual project as an example to carry out a detailed discussion on the geological reconnaissance of the construction of the mineshaft in phosphate mine,and the comprehensive prevention measures of water damage and adverse geological action sites of phosphate mine mineshaft are deeply analyzed for reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7