检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张瑞 郭红星 马彦龙 曹思华 耿民 ZHANG Rui;GUO Hongxing;MA Yanlong;CAO Sihua;GENG Min(Guqiao Coal Mine,Huainan Mining(Group)Co.,Ltd.;Xi'an Research Institute,CCTEG)
机构地区:[1]淮南矿业(集团)有限责任公司顾桥煤矿,安徽省淮南市232150 [2]中煤科工西安研究院(集团)有限公司,陕西省西安市710077
出 处:《现代矿业》2024年第2期218-221,共4页Modern Mining
摘 要:在煤矿智能化掘进过程中,超前探查至关重要。目前,掘进工作面超前探测时,都是在工作面停止掘进的基础上进行作业,无法做到边掘边探、随掘随探。基于在线式矿井地震监测分站构建的随掘地震实时超前探测系统在巷道掘进的同时,采集掘进机震动引起的地震数据,通过光纤网络实时传输至地面服务器的数据库,数据处理软件从数据库中获取当前随掘数据,经过筛选、提取虚拟炮集和偏移成像等,对掘进前方和侧前方一定区域进行反射槽波成像,实现以综掘机切割震动为震源,利用连续振动波的回波,对巷道前方地质异常体的超期探测。以顾桥煤矿智能化掘进工作面1126(3)运顺巷为例,开展随掘地震实时超前探测技术研究。结果表明,随掘地震可超前探查100m范围内落差大于1/2煤层厚度的断层位置及走向,平面位置摆动误差小于5 m,总体探测成果准确率达80%以上,形成了巷道超前探测递进式地质透明化的一种保障技术。In the process of intelligent mining in coal mine,the advance exploration is very impor-tant.At present,the advance detection of the mining face is carried out on the basis of the stop of the min-ing face,and it cannot be carried out while digging and with digging.During tunneling,real-time advance Earthquake with Excavation detection system based on online mine seismic monitoring sub-stations.Exca-vation machine vibration collects and transmits to the database of ground server in real time through optical fiber network.Data processing software obtains current data with excavation from the database.Through screening,extraction of virtual gun set and migration imaging,the reflected trough wave imaging is carried out in a certain area in front and side of excavation,and the cutting vibration of integrated excavator is used as the focal point,and the echo of continuous vibration wave is used to realize the overdue detection of geological anomalies in front of roadway.Taking transportation roadway of intelligent driving face 1126(3)in Guqiao Coal Mine as an example,the research on real-time advance detection during excation technology is carried out.The results show that the position and strike of the fault with a drop greater than 1/2 coal thickness within 100 m can be explored in advance with the excavation earthquake,and the swing error of the plane position is less than 5 m.The overall accuracy of the detection results is more than 80%,which forms a support technology for progressive geological transparency in advance detection in front of the roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.168.194