检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈威 Shen Wei(Jiujiang Xinfa Construction Engineering Co.Ltd.,Jiujiang,Jiangxi 332000)
机构地区:[1]九江鑫发建设工程有限责任公司,江西九江332000
出 处:《江西建材》2023年第12期280-282,共3页Jiangxi Building Materials
摘 要:文中以S地块一期项目为工程实例,依据“先支后挖、逐层开挖、随挖随撑”的基本思路,从基坑支护方案、开挖与支护施工、基坑监控测量三方面分析了在场地受限条件下,“钻孔灌注桩+钢管内支撑”组合支护体系在深基坑工程中的应用。监测结果表明,本工程坑壁位移(水平和竖向)和周边建筑物沉降均在限值范围内,且无明显不均匀沉降,施工全过程处于安全可控状态。Taking the first phase project of S plot as an engineering example,based on the basic idea of"support first and then excavation,layer by layer excavation,and excavation with support",this paper analyzes the application of the"drilled cast-in-place pile+steel pipe internal support"combination support system in deep foundation pit engineering under site limited conditions from three aspects:foundation pit support scheme,excavation and support construction,and foundation pit monitoring and measurement.The monitoring results indicate that the displacement of the pit wall(horizontal and vertical)and the settlement of surrounding buildings in this project are within the limit range,and there is no obvious uneven settlement.The entire construction process is in a safe and controllable state.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15