检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋振芳 Song Zhenfang(China Railway 14th Bureau Second Engineering Co.Ltd.,Tai'an,Shandong 271037)
机构地区:[1]中铁十四局集团第二工程有限公司,山东泰安271037
出 处:《江西建材》2023年第12期314-316,共3页Jiangxi Building Materials
摘 要:镇江关站1号五线特大桥A32^(#)-A39^(#)墩墩身高度5.3~24 m,站台梁采用支架法施工,模板采用工厂加工的定型钢模板。站台梁单孔长32.64 m,梁高1.8 m,底板宽3.4 m,顶板宽6 m。文中通过对模板工程进行优化,分析了滑动模板体系在多跨连续现浇梁施工中的滑动体系设计、施工技术和经济效益。The pier height of A32^(#)-A39^(#)pier of Zhenjiangguan No.1 Super Large Bridge is 5.3~24 m.The platform beam is constructed by the support method,and the formwork is made of steel formwork.The length of the single hole of the platform beam is 32.64 m,the height of the beam is 1.8 m,the width of the bottom plate is 3.4 m,and the width of the top plate is 6 m.Through the optimization of formwork engineering,this paper describes the design,construction technology and economic benefit of sliding formwork system in the construction of multi-span continuous cast-in-place beam.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7