检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:莫丹 Mo Dan(Special Steel Branch of Shijiazhuang Iron and Steel Co.,Ltd.,Shijiazhuang Hebei 050100,China)
机构地区:[1]石家庄钢铁有限责任公司特殊钢分公司,河北石家庄050100
出 处:《山西冶金》2024年第1期46-47,50,共3页Shanxi Metallurgy
摘 要:为解决当前高钒铁合金炉外冶炼工艺落后、工序设计不合理,最终导致的钒回收率低、产品质量不均以及成本高的问题,在对高钒铁炉外精炼工艺流程进行综合分析的基础上,采用高试验方案对喷吹工艺对炉外冶炼工艺的改善效果进行对比分析,并重点研究了喷吹料粒度和喷吹量对喷吹效果,为今后电炉冶炼工艺的优化提供了理论基础。In order to solve the problems of low vanadium recovery rate,uneven product quality,and high cost caused by the outdated and unreasonable process design of the current high vanadium iron alloy smelting process outside the furnace,based on a comprehensive analysis of the high vanadium iron refining process flow outside the furnace,a high test plan was adopted to compare and analyze the improvement effect of the spraying process on the outside smelting process,and the effect of the spraying material particle size and spraying amount on the spraying effect was mainly studied.This provides a theoretical basis for the optimization of future electric furnace smelting processes.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.221.78