检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵俊 Zhao Jun(Sihe Coal Mine,Jinneng Holding Equipment Manufacturing Group Co.,Ltd.,Jincheng Shanxi 048200,China)
机构地区:[1]晋能控股装备制造集团有限公司寺河煤矿,山西晋城048200
出 处:《山西冶金》2024年第1期239-241,共3页Shanxi Metallurgy
摘 要:为了解决6306综采面巷道顶板易破碎、煤壁易片帮的问题,提出采用“注浆加固+棕绳加固”的控制方案,利用FLAC仿真分析软件对该方案的有效性进行了仿真验证,确定了加固工作方案的技术参数,并对在井下注浆加固和棕绳加固的应用情况进行了论述,根据实际应用表明,该控制方案能够彻底解决井下煤壁片帮问题。In order to solve the problems of easy fragmentation of the roof and coal wall fragmentation in the 6306 fully mechanized mining face roadway,a control scheme of"grouting reinforcement+brown rope reinforcement"is proposed.The effectiveness of this scheme is simulated and verified using FLAC simulation analysis software.The technical parameters of the reinforcement work scheme are determined,and the application of grouting reinforcement and brown rope reinforcement in the underground is discussed.According to practical applications,it is shown that this control scheme can completely solve the problem of coal wall fragmentation underground.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79