检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Minghao Cao Jilai Yu
机构地区:[1]the Department of Electrical Engineering,Harbin Institute of Technology,Harbin,China
出 处:《Journal of Modern Power Systems and Clean Energy》2024年第1期101-114,共14页现代电力系统与清洁能源学报(英文)
基 金:supported in part by the National Natural Science Foundation of China(No.51877049).
摘 要:With the increasing proportion of renewable energy sources(RESs)in power grid,the reserve resource(RR)scarcity for correcting power deviation of RESs has become a potential issue.Consequently,the power curve of RES needs to be more rigorously assessed.The RR scarcity varies during different time periods,so the values of assessment indicators should be dynamically adjusted.The assessment indicators in this paper include two aspects,i.e.,deviation exemption ratio and penalty price.Firstly,this paper proposes a method for dynamically calculating the supply capacity and RR cost,primarily taking into account the operating status of thermal units,forecast information of RES,and load curve.Secondly,after clarifying the logical relationship between the degree of RR scarcity and the values of assessment indicators,this paper establishes a mapping function between them.Based on this mapping function,a dynamic setting method for assessment indicators is proposed.In the future,RES will generally be equipped with battery energy storage systems(BESSs).Reasonably utilizing BESSs to reduce the power deviation of RESs can increase the expected income of RESs.Therefore,this paper proposes a power curve optimization strategy for RESs considering self-owned BESSs.The case study demonstrates that the dynamic setting method of assessment indicators can increase the revenue of RESs while ensuring that the penalty fees paid by RESs to the grid are sufficient to cover the RR costs.Additionally,the power curve optimization strategy can help RESs further increase income and fully utilize BESSs to reduce power deviation.
关 键 词:Renewable energy battery energy storage system(BESS) power curve assessment reserve service parameter setting
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.127.127