检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陆全周 LU Quanzhou(Lanzhou Jiaotong University Engineering Testing Co.,LTD.,Lanzhou 730000,China)
机构地区:[1]兰州交通大学工程检测有限公司,甘肃兰州730000
出 处:《云南水力发电》2024年第3期38-40,共3页Yunnan Water Power
摘 要:友谊隧道通过地段工程地质及水文地质情况复杂,还存在顺层偏压、滑坡、溜等不良地质条件以及软土、岩盐、石膏、膨胀土等特殊岩土。通过地质雷达对友谊隧道衬砌进行衬砌厚度、钢筋(钢架)分布情况、衬砌背后回填密实度以及二衬混凝土强度等工程质量检测,检测结果可以直接反映隧道衬砌结构变化情况,对后期工程缺陷整治和验收提供数据支撑和方法指导。The engineering geology and hydrogeological conditions of the section where Youyi Tunnel passes through are complex,and there are also adverse geological conditions such as bedding pressure,landslides,and landslides,as well as special rock and soil such as soft soil,rock salt,gypsum,and expansive soil.By using ground penetrating radar,the thickness of the lining,distribution of steel bars(steel frames),compactness of backfill behind the lining,and strength of the secondary lining concrete of the Friendship Tunnel lining are tested for engineering quality.The detection results can directly reflect the changes in the tunnel lining structure,providing data support and method guidance for later engineering defect rectification and acceptance.
分 类 号:U456.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117