检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:温浩 WEN Hao(Shenzhen Guanghuiyuan Engineering Construction Co.,Ltd.,Shenzhen 518000,China)
机构地区:[1]深圳市广汇源水利建筑工程有限公司,广东深圳518000
出 处:《云南水力发电》2024年第3期82-86,共5页Yunnan Water Power
摘 要:大坝混凝土在大体积浇筑过程中由于水泥水化放热,易在混凝土内部形成不均匀的温度梯度应力场,增加了混凝土开裂风险。以赤坳水库主坝除险加固工程为研究背景,针对大体积混凝土浇筑施工中的温控防裂,提出冷却水循环系统降温,结合温度场函数测控系统的大体积混凝土降温测温一体系统,达到精细化、安全化指导温控施工的目的。During the large volume pouring process of dam concrete,due to the heat release from cement hydration,an uneven temperature gradient stress field is easily formed inside the concrete,which increases the risk of concrete cracking.This paper takes the main dam reinforcement project of Chiao Reservoir as the research background,and proposes a cooling water circulation system for temperature control and crack prevention in the construction of large volume concrete pouring.A temperature field function measurement and control system combined with a large volume concrete cooling and temperature measurement integrated system achieves the goal of precision and safety guidance for temperature control construction.
分 类 号:TV544.91[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.93