检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹亮 余楚江 CAO Liang;YU Chu-jiang(Guangzhou Design Institute Group Co.,Ltd.,Guangzhou 510620)
出 处:《广州建筑》2024年第1期21-24,共4页GUANGZHOU ARCHITECTURE
摘 要:广州某剧院高度为82.1 m,存在7项不规则项,裙房为1200座大剧场,塔楼主要为办公室,转换层位于六层楼面。运用结构概念设计思维,采用下部钢筋混凝土空腹桁架+上部带二次托柱转换的框架-剪力墙结构体系,叠层空腹桁架作为二次转换的安全储备,提高了结构的安全冗余度;进行了罕遇地震作用下的动力弹塑性分析及转换层楼板应力分析,通过提高底部加强区剪力墙配筋率、在转换构件中增设型钢、加强转换层楼板厚度及配筋等措施,可达到设计预期目标。Atheater in Guangzhou is 82.1 m high with 7 irregular items.The main functions of podium and tower are theater and office,respectively,and the transfer floor is located on the sixth floor.Using structural conceptual design thinking,the frame-shear wall structure system with lower reinforced concrete hollow truss and upper secondary conversion is adopted.The laminated open-web truss serves as a safety reserve for the secondary conversion,improving the safety redundancy of the structure.The dynamic elastic-plastic analysis under rare earthquake and stress analysis of the transfer floor slab were conducted.Through increasing the reinforcement ratio of shear wall in bottom strengthened area,adding steel to transfer members,and strengthening the thickness and reinforcementof transfer floor slab,the design targetcould be achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.91.70