检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苏红青 严鹏华 郭明月 靳雷 SU Hongqing;YAN Penghua;GUO Mingyue;JIN Lei
机构地区:[1]江苏省妇幼保健院,南京210036
出 处:《中国医院建筑与装备》2024年第3期59-63,共5页Chinese Hospital Architecture & Equipment
摘 要:为积极贯彻落实“十四五”时期公立医院高质量发展要求,建设“三位一体”智慧医院,医院的智能化建设得到飞速发展。而医院病区弱电间作为智慧医院的重要场所,其供电系统往往没有得到足够重视,在运行过程中经常遇到因供电问题而导致的网络故障、供电安全性得不到保证、运维复杂、能耗高等诸多问题。该文从医院后勤运维管理角度出发,结合医院实际情况,对病区弱电间的供电系统方案进行改造试点探索,以达到安全、可靠、经济的供电目标。In order to actively implement the high-quality development requirements of public hospitals during the"14th Five-Year Plan"period and build a"Trinity"smart hospital,the intelligent construction of hospitals has developed rapidly.As an important place in a smart hospital,the power supply system of weak current rooms in the hospital wards often has not taken seriously.During operation,power supply problems are often encountered;such as network failures;power supply security cannot be guaranteed;operation and maintenance are complicated;high energy consumption and many other problems.From the perspective of hospital logistics operation and maintenance management,combined with the actual situation of the hospital,it conducts a pilot exploration of the power supply system scheme for the weak current rooms in the wards to achieve safe,reliable and economical power supply goals.
分 类 号:R197[医药卫生—卫生事业管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.138.191.28