检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙泽龙 SUN Zelong(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou 450001,Henan,China)
机构地区:[1]中国水利水电第十一工程局有限公司,河南郑州450001
出 处:《工程技术研究》2024年第2期61-63,共3页Engineering and Technological Research
摘 要:在桥梁工程项目建设中,为满足现场施工要求,往往需要通过挂篮完成箱梁各个节段的施工。为此,应当了解和掌握挂篮施工关键技术,并对其进行合理应用,确保桥梁施工顺利进行。基于此,文章以某高速公路桥梁工程为依托,从挂篮拼装、挂篮预压及挂篮前移等方面出发,对桥梁工程挂篮施工关键技术展开论述,旨在为同类工程提供参考。In the construction of bridge engineering projects,in order to meet the requirements of on-site construction,it is often necessary to complete the construction of each segment of the box girder through hanging baskets.Therefore,it is necessary to understand and master the key technology of hanging basket construction,and apply it reasonably to ensure the smooth progress of bridge construction.Based on this,this paper takes an expressway bridge project as a basis to discuss the key technology of hanging basket construction in bridge engineering from the aspects of hanging basket assembly,hanging basket preloading and hanging basket forward movement,aiming to provide reference for similar engineering.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.225