检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李东 LI Dong(Ningbo Highway Municipal Design Co.Ltd.,Ningbo315016,China)
机构地区:[1]宁波公路市政设计有限公司,浙江宁波315016
出 处:《工程建设与设计》2024年第4期81-83,共3页Construction & Design for Engineering
摘 要:以实际项目的双体承压舟浮桥结构设计为背景,对不同横舱壁位置、底封板数量和连接桥跨度下的承压舟结构受力进行了对比分析。建议保留原设计方案的横舱壁设计,底封板数量应由4块增加至8块,可适当增加连接桥跨度以提升汛期泄流和河中漂浮物通过的能力。Based on the structural design of practical project catamaran pressure vessel floating bridge,this paper makes a comparative analysis on the stress of pressure vessel structure under different transverse bulkhead positions,the number of bottom sealing plates and the span of connecting bridge.It is suggested to retain the design of transverse bulkhead in the original design scheme,increase the number of bottom sealing plates from four to eight,and appropriately increase the span of connecting bridge to improve the ability of discharge and floating objects in the river in flood season.
关 键 词:双体承压舟浮桥 横舱壁 底封板 连接桥跨度 结构优化
分 类 号:U448.19[建筑科学—桥梁与隧道工程] U441[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43