5 MW级全功率变速恒频发电电动机调试期间发现的问题及解决方案  

Problems found during commissioning of 5 MW full power variable speed constant frequency generator motor and solutions

在线阅读下载全文

作  者:张艳竹[1] 白晶 ZHANG Yanzhu;BAI Jing(Harbin Institute of Large Electrical Machinery,Harbin 150040,China)

机构地区:[1]哈尔滨大电机研究所,哈尔滨150040

出  处:《上海大中型电机》2024年第1期42-44,共3页Shanghai Medium and Large Electrical Machines

摘  要:国内首座全功率变速恒频抽水蓄能示范电站机组在安装调试期间发现了一些问题,本文针对发电电动机方面所遇到的一些问题及解决方案进行了详细的阐述,可作为其他抽蓄电站机组调试的经验借鉴。Some problems have been found during the installation and commissioning of the first full power variable speed constant frequency pumped-storage,on the demonstration of power plant set in China.In this paper,some problems and solutions encountered in the generation motor are elaborated in detail,which is taken as a reference for the commissioning of other pumping and storage power plants.

关 键 词:抽蓄机组 发电电动机 调试期间问题 解决方案 

分 类 号:TM307[电气工程—电机]

 