检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王焘 妙超 范超鹏 雷鹏 WANG Tao;MIAO Chao;FANChaopeng;LEI Peng(Shanxi Branch,China Building Materials Industrial Geological Exploration Center,Xi’an 710003)
机构地区:[1]中国建筑材料工业地质勘查中心陕西总队,西安710003
出 处:《四川地质学报》2024年第1期32-35,40,共5页Acta Geologica Sichuan
摘 要:露天石灰岩矿山传统开发模式导致开采终了人工地貌与外围原生地貌不协调,生态修复难度和成本大。以铜川市上店石灰岩矿为例,提出在矿产规划、地质勘查、开发利用、生态修复各环节进行全程控制,实现绿色勘查开发,旨在为后期同类矿山开发、整合提供借鉴。The traditional development mode of open-pit limestone mine results in the disharmony between artificial landform and peripheral primary landform at the end of mining,and the difficulty and cost of ecological restoration are high.Taking Shangdian limestone mine in Tongchuan City as an example,it is proposed that the whole process of mineral planning,geological exploration,development and utilization,ecological restoration should be controlled to realize green exploration and development,aiming at providing reference for the later development and integration of similar mines.
分 类 号:TD87[矿业工程—非金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62