检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔小龙 CUI Xiao-long(Shanxi Changzhi Highway Survey and Design Institute Co.Ltd.,Changzhi 046000,China)
机构地区:[1]山西长治公路勘察设计院有限公司,山西长治046000
出 处:《工程建设与设计》2024年第5期133-135,共3页Construction & Design for Engineering
摘 要:在寒冷的冻土地区,施工季节的气温仍然较低,有些地方甚至在夜间会达到0℃以下,这导致实际施工条件与室内的预期标准相差很大,因此,水泥稳定砂砾桩设计方法与传统的设计方法有许多不同之处。基于此,论文根据现场条件从原材料选定、无侧限抗压强度试验、试验配合比、生产配合比及制作注意事项5个方面,详细介绍了冻土地区路面水泥稳定砂砾桩配合比的设计过程。In cold permafrost areas,the temperature during the construction season is still relatively low,and in some places it may even reach negative temperatures at night,which leads to a significant difference between the actual construction conditions and the expected in-door standards.Therefore,there are many differences between the design methods and the usual ones.Based on this,this article provides a detailed introduction to the design process of cement stabilized gravel pile mix proportion for pavement in permafrost areas,based on five aspects:selection of raw materials,unconfined compressive strength test,test mix proportion,production mix proportion,and production precautions,based on on-site conditions.
分 类 号:U416.03[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.79.92