检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈逸 吴保生 王彦君 覃超 郑珊 SHEN Yi;WU Baosheng;WANG Yanjun;QIN Chao;ZHENG Shan(State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing,100084,China;Key Laboratory of Hydrosphere Sciences of the Ministry of Water Resources,Tsinghua University,Beijing,100084,China;Department of Hydraulic Engineering,Tsinghua University,Beijing,100084,China;Key Laboratory of River Regulation and Flood Control of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,430010,China;State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan,430072,China)
机构地区:[1]State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing,100084,China [2]Key Laboratory of Hydrosphere Sciences of the Ministry of Water Resources,Tsinghua University,Beijing,100084,China [3]Department of Hydraulic Engineering,Tsinghua University,Beijing,100084,China [4]Key Laboratory of River Regulation and Flood Control of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,430010,China [5]State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan,430072,China
出 处:《Journal of Geographical Sciences》2024年第3期591-609,共19页地理学报(英文版)
基 金:National Natural Science Foundation of China,No.U2243218。
摘 要:This study focuses on the Lower Yellow River(LYR),which has experienced continuous erosion since the operation of Xiaolangdi Reservoir in 1999,and its spatiotemporal variation process is complex.Based on the single-step mode of the Delayed Response Model(DRM),we proposed a calculation method for simulating the accumulated erosion and deposition volume in the LYR.The coefficient of determination R^(2)between the calculated and measured values from 2000 to 2020 is 0.99.Currently,the LYR is undergoing continuous erosion,however the erosion rate is gradually slowing down,and the difference between the equilibrium and calculated values of accumulated erosion and deposition volume gradually decreases,which means riverbed erosion has a tendency towards equilibrium.Additionally,we derive a formula to simulate the spatial distribution of the main channel accumulated erosion volume per unit river length in the LYR based on the non-equilibrium suspended sediment transport equation.The coefficient of determination R^(2)between the fitted values and measured values from 2003 to 2015 is approximately 0.98-0.99,with a relative error of approximately 6.2%.The findings in this research suggest that under the current background of decreasing sediment inflow and continuous erosion in the LYR,it takes approximately 3.0 years for the riverbed to achieve half of the erosion and deposition adjustment and approximately 13.0 years to achieve 95%of the adjustment.Moreover,the spatial distribution of accumulated main channel erosion volume in the LYR tends to become uniform with the continuous development of erosion.These results could provide a valuable reference for analysing the complex spatiotemporal variation process in the LYR.
关 键 词:Lower Yellow River erosion and deposition adjustment Delayed Response Model non-equilibrium sediment transport equation
分 类 号:TV145[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.149.213