BIM技术在1000MW大型火力发电工程中的应用  被引量:1

Application of BIM Technology in 1000MW Large-scale Thermal Power Plant

在线阅读下载全文

作  者:江兆尧 谢跃文[2] JIANG Zhaoyao;XIE Yuewen(China Construction Industry Association;Ministry of Housing and Urban-Rural Development Information Center)

机构地区:[1]中国建筑业协会 [2]住房和城乡建设部信息中心

出  处:《中国建设信息化》2024年第6期56-61,共6页Informatization of China Construction

摘  要:随着我国电力建设技术的快速发展,目前1000MW机组工程成为了主流,为保证工程顺利施工,需要借助数字化手段,赋能过程管理。本文介绍了将BIM技术应用于火力发电项目建设过程,辅助进行方案交底,特别是解决重大技术方案不直观、交底不透彻的问题,提升技术交底质量,从而减少返工和成本,产生良好的经济效益。重点介绍一种采用井字架吊具转换吊装高加设备的方法,在吊装施工前进行施工模拟重点技术工艺分析,开展建模内容分析和建模软件选择,进而建模和开展施工模拟,并以其中3个具有代表性的技术工艺模拟优化过程为例,阐述了BIM技术在项目立式高加安装中的应用。通过经济性分析,该施工方案经济效益明显,证明BIM技术的三维化、优化性、模拟性等优点,对于保障危重大施工方案的安全、顺利实施可以发挥十分重要的作用。With the rapid development of power construction technology in China,the 1000MW unit project has become the mainstream.To ensure the smooth construction of the project,digital means are needed to empower process management.This article introduces the application of BIM technology in the construction process of thermal power generation projects to assist in scheme disclosure,especially to solve the problems of unclear and incomplete technical schemes,improve the quality of technical disclosure,reduce rework and costs,and generate good economic benefits.The article focuses on a method of using“#”shaped hanger to convert and hoist high-pressure equipment,and conducts construction simulation and key technical process analysis before hoisting construction,Conduct modeling content analysis and software selection,and then model and conduct construction simulation.Taking three representative technology process simulation optimization processes as examples,this paper elaborates on the application of BIM technology in the installation of vertical high-pressure heaters in projects.Through economic analysis,the construction plan has obvious economic benefits,demonstrating the advantages of BIM technology in terms of three-dimensional,optimization,and simulation.It can play a very important role in ensuring the safety and smooth implementation of major construction plans.

关 键 词:BIM技术 施工模拟 立式高压加热器 井字架吊具 

分 类 号:TU741.1[建筑科学—建筑技术科学] TU17

 