检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯刚 张东[1] 王铨 赵克鑫 HOU Gang;ZHANG Dong;WANG Quan;ZHAO Ke-xin(School of Energy and Power Engineering,Lanzhou University of Technology,Lanzhou,China,730050;Gansu Seventh Construction Group Co.,Ltd.,Lanzhou,China,730030)
机构地区:[1]兰州理工大学能源与动力工程学院,甘肃兰州730050 [2]甘肃省第七建设集团股份有限公司,甘肃兰州730030
出 处:《热能动力工程》2024年第2期82-90,共9页Journal of Engineering for Thermal Energy and Power
基 金:国家自然科学基金项目(51806093);兰州市城关区科技计划项目(2021JSCX0046);甘肃省教育厅产业支撑计划项目(2021CYZC-27)。
摘 要:燃气锅炉排放的烟气中含有大量的水蒸气,因排烟温度未能降到露点以下而无法有效回收水蒸气的冷凝潜热。本文采用压缩式热泵与低温空预器相结合的方式深度回收燃气锅炉烟气余热,主要研究了在不同过量空气系数下供热回水流量和供热回水温度对排烟温度、余热回收效率、热泵机组制热性能系数及水蒸气冷凝率的影响。研究结果表明:在过量空气系数为1、供热回水流量为80 t/h条件下,热泵可将供热回水温度从50.0℃提升至65.1℃,其制热性能系数为4.25;空气进、出低温空预器的温度分别为-3.8℃和33.0℃,流量为15360 m^(3)/h时,排烟温度从90℃降至20℃,烟气余热回收效率达到14.8%;以29 MW的燃气锅炉为研究对象,按供热面积为5.2×10^(5)m^(2),供暖151天计算,烟气中回收的冷凝水量为8000 t,占锅炉补水量的54.1%;该余热回收系统的投资回收期为2.1年,压缩式热泵烟气余热回收系统节能效果显著。The flue gas emitted by the gas boiler contains a large amount of water vapor,and the condensation latent heat of water vapor cannot be effectively recovered due to the failure of the exhaust gas temperature to fall below the dew point.In this paper,the compressed heat pump combined with low temperature air preheater is used to recover the flue gas waste heat of gas boiler in depth.The effects of heating return water flow rate and heating return water temperature on flue gas temperature,waste heat recovery efficiency,heating performance coefficient of heat pump unit and condensation rate of water vapor under different excess air coefficients are mainly studied.The results show that when the excess air coefficient is 1 and the return water flow rate is 80 t/h,the heat pump can increase the return water temperature from 50℃to 65.1℃,and the heating performance coefficient is 4.25;when the air inlet and outlet tempera tures of the low-temperature air preheater are-3.8℃and 33.0℃respectively,and the flow rate is 15360 m^(3)/h,the exhaust temperature drops from 90℃to 20℃,and the flue gas waste heat recovery efficiency reaches 14.8%;for a 29 MW gas boiler with a heating area of 5.2×10^(5)m^(2)and 151 days of heating,the amount of condensate recovered from flue gas is 8000 tons,accounting for 54.1%of the boiler water replenishment rate;the payback period for this waste heat recovery system is 2.1 years.The flue gas waste heat recovery system of compressed heat pump has a significant energy saving effect.
关 键 词:烟气余热回收 压缩式热泵 低温空预器 冷凝水回收
分 类 号:TK115[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38