深厚表土综放采场断层煤柱整体失稳型冲击地压机制研究  被引量:6

Research on the mechanism of overall instability type rock burst of fault coal pillars in deep topsoil fully mechanized top coal caving mining area

在线阅读下载全文

作  者:张翔 朱斯陶 张修峰 姜福兴[1] 刘金海[3] 陈洋 万晓 杨涛[3] 朱淳 李佳洁 ZHANG Xiang;ZHU Sitao;ZHANG Xiufeng;JIANG Fuxing;LIU Jinhai;CHEN Yang;#br#WAN Xiao;YANG Tao;ZHU Chun;LI Jiajie(School of Civil and Resource Engineering,University of Science and Technology Beijing,Beijing 100083,China;Shandong Energy Group Company Limited,Jinan,Shandong 250014,China;Hebei State Key Laboratory of Mine Disaster Prevention,North China Institute of Science and Technology,Langfang,Hebei 101601,China;Shandong Xinjulong Energy Co.,Ltd.,Heze,Shandong 274918,China;School of Earth Science and Engineering,Hohai University,Nanjing,Jiangsu 211100,China)

机构地区:[1]北京科技大学土木与资源工程学院,北京100083 [2]山东能源集团有限公司,山东济南250014 [3]华北科技学院河北省矿井灾害防治重点实验室,河北廊坊101601 [4]山东新巨龙能源有限责任公司,山东菏泽274918 [5]河海大学地球科学与工程学院,江苏南京211100

出  处:《岩石力学与工程学报》2024年第3期713-727,共15页Chinese Journal of Rock Mechanics and Engineering

基  金:国家重点研发计划项目(2022YFC3004604);国家自然科学面上基金项目(52374076);中国科协青年人才托举工程项目(2021QNRC001)。

摘  要:深厚表土综放采场断层煤柱整体失稳型冲击地压具备高隐蔽性、强破坏性、难防护性和长延续性的破坏特征,煤矿现场难以有效预警和防治。以巨野煤田某矿2305S工作面为工程背景,采用理论分析、数值模拟、现场实测等方法,研究深厚表土综放采场断层煤柱整体失稳型冲击地压机制。探讨了深厚表土综放采场岩-土地层初次、周期联动的空间结构和力学特征,设计了深厚表土综放采场断层煤柱承载地层传递载荷、上覆自重载荷和断层构造载荷的估算方法,提出了深厚表土综放采场断层煤柱整体失稳型冲击地压的力学判据。根据模拟应力增速演变规律将断层煤柱回采过程划分为蓄能阶段和临界阶段,其中临界阶段整体失稳冲击危险水平快速提升。揭示了深厚表土综放采场断层煤柱整体失稳型冲击地压机制:断层与沿空面斜交形成的断层煤柱具备高水平的基础应力,当工作面推进至岩-土地层初次联动阶段时,走向地层传递载荷提高了断层煤柱的应力水平,同时连续推采条件下其承载面积不断减小,当载荷量超过弹性承载区的失稳阈值时即发生整体失稳型冲击地压。设计了此类型冲击地压治理方案,包括采前整体冲击危险评估、井地联合区域监测-弹核应力局部预警、分级承载多层卸压设计。Rockburst induced by the overall instability of fault coal pillar in the stope under thick overburden soil exhibits destructive characteristics such as high concealment,strong destructiveness,difficulty in protection,and long duration,which is challenging to predict and prevent effectively in the coal mine field.Taking the 2305S working face of a mine in the Juye coal field as the engineering background,this study adopts theoretical analysis,numerical simulation,and field measurement to investigate the mechanism of rockburst induced by the overall instability of fault coal pillar in the stope under thick overburden soil.The conclusions are as follows:the study discusses the spatial structure and mechanical characteristics of the initial and periodic interactions of rock-soil strata in the stope under thick overburden soil,designs a calculation method for the load-bearing strata to bear the transferred load,overlying self-weight load,and fault structural load,and proposes a mechanical criterion for the rockburst induced by the overall instability of the fault coal pillar in the stope under thick overburden soil.According to the evolution law of simulated stress growth rate,the mining process of fault coal pillars is divided into energy storage stage and critical stage,in which the overall instability shock hazard level rapidly increases during the critical phase.The mechanism of rockburst induced by the overall instability of fault coal pillar in the stope under thick overburden soil is revealed:the fault coal pillar,formed by the intersection of the fault and the goaf,carries a high level of base stress.When the working face advances to the initial interaction phase of the rock-soil strata,the transferred load from the trend strata increases the stress level of the fault coal pillar,while its bearing area decreases continuously under the conditions of continuous mining.When the load exceeds the instability threshold of the elastic bearing zone,a rockburst caused by overall instability occurs.A control plan for th

关 键 词:采矿工程 冲击地压 深厚表土 断层煤柱 整体失稳 

分 类 号:TD32[矿业工程—矿井建设]

 