检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王长虹 杨天笑 马铖涛 沈洋 WANG Chang-hong;YANG Tian-xiao;MA Cheng-tao;SHEN Yang(Department of Civil Engineering,School of Mechanics and Engineering Sciences,Shanghai University,Shanghai 200444,China)
机构地区:[1]上海大学力学与工程科学学院土木工程系,上海200444
出 处:《岩土力学》2024年第3期846-856,共11页Rock and Soil Mechanics
基 金:上海高校特聘教授岗位计划(No.TP2018042);上海市浦江人才计划(No.18PJ1403900);上海市社会发展科技攻关项目(No.21DZ1204300)。
摘 要:随着城市地下空间的开发,深厚黏性土地区的基础抗浮问题愈发凸显。钻孔预制桩因环境友好,得到了广泛的应用,但钻孔过程削弱了预制桩的抗拔性能。拟开发一种新型的约束注浆挤扩钢管桩,为了准确评估束浆挤扩桩的承载力,分析了抗拔桩的破坏模式。基于对数螺旋线,提出局部滑裂面理论。采用经典案例,验证了抗拔承载力公式的有效性。基于正交试验设计理念,研究了束浆挤扩桩承载力的影响因素。结果表明,桩径和桩-土界面强度,对抗拔承载力的贡献最大。开展束浆挤扩桩的现场抗拔试验,与同直径钢管桩相比,束浆挤扩工艺可提高抗拔承载力达到70%。使用简化计算公式,计算基桩的抗拔承载力,误差控制在5%以内,更为准确安全。研究结果为约束注浆挤扩钢管桩承载力的设计和优化,提供了理论和技术参考。With exploiting of the urban underground space,the problem of anti-floating foundation becomes prominent in the soft soil areas.Bored and precast piles are widely used due to their environmental friendliness,but drilling process typically reduces the shaft resistance.Thus a constrained grouting pile is proposed.In order to accurately evaluate the uplift capacity of steel pipe pile with constrained grouting,the failure mechanism is analyzed,and the logarithmic spiral curve is adopted to fit the local slip surface.The simplified calculation formula is derived,and its effectiveness is verified by a classic case study.Based on the design concept of orthogonal experiment,the influencing factors of uplift capacity are compared.The results show that the diameter of pile and the strength of pile-soil interface control the uplift capacity.Field test on the steel pipe pile with constrained grouting is carried out.The test shows that the uplift capacity of the pile is increased by 70%.It is more accurate and safer to use the theoretical formula proposed to calculate the uplift capacity of foundation pile.The research results provide reference for the uplift capacity design of the constrained grouting piles.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222