检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李辉 王云飞 LI Hui;WANG Yun-fei(Xinjiang Production and Construction Corps Survey and Design Institute Group Co.,Ltd.,Urumqi Xinjiang 830000,China)
机构地区:[1]新疆兵团勘测设计院集团股份有限公司,新疆乌鲁木齐830000
出 处:《西部探矿工程》2024年第3期183-186,共4页West-China Exploration Engineering
摘 要:深埋隧洞高地应力岩爆、大变形灾害已经成为制约地下工程施工的重要影响因素,对地应力的研究了解深部岩体破坏机理及相应的防治对深埋隧洞的设计和施工具有实际意义。依托西安市引蓝济李引水工程高地应力测试成果结合施工期深部岩体的破坏形式进行分析研究,并提出相应的防治处理措施,可为类似工程的勘察设计施工提供经验与指导。The high stress rock burst and large deformation disasters caused by deep buried tunnels have become important influencing factors that restrict underground engineering construction.Therefore,conducting research on geostress,understanding the mechanism of deep rock mass failure,and corresponding prevention and control measures have practical significance for the design and construction of deep buried tunnels.Based on the high ground stress test results of the Xi'an Blue to Li Water Diversion Project,combined with the analysis and research of the failure mode of deep rock mass during construction,corresponding prevention and control measures are proposed,which can provide experience and guidance for the survey,design and construction of similar projects.
关 键 词:隧洞 高地应力 破坏型式 岩爆 张裂、劈裂剥落 构造松弛破坏 塑性变形 防治措施
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.240.94