检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林依青 黄烜 LIN Yiqing;HUANG Xuan(Shantou Power Supply Bureau,Guangdong Power Grid Co.,Ltd.,Shantou,Guangdong 515000,China)
机构地区:[1]广东电网有限责任公司汕头供电局,广东汕头515000
出 处:《自动化应用》2024年第5期120-121,125,共3页Automation Application
摘 要:海上风电是我国加快能源清洁低碳转型、构建新型电力系统的重要战略支撑。介绍了220 kV海上风电场升压站电气二次一种典型接线方式——内桥接线方式的保护配置,总结了其跳闸、远跳、启动失灵的关键回路,并提出了相关的运维风险管控措施,为今后类似工程的验收及部分设备的停电检修工作提供了参考。Offshore wind power is an important strategic support for China to accelerate the clean and low-carbon energy transformation and build a new power system.This paper introduces the protection configuration of the inner bridge wiring method,a typical electrical wiring method of 220 kV offshore wind power farm booster station,summarizes the key circuits of tripping,long-hopping and start-up failure,and puts forward relevant operational risk management and control measures to provide reference for the acceptance of similar projects and the power outage maintenance of some equipment in the future.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33