检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王浩宇 WANG Haoyu(Huozhou Coal Power Xin mine,Shanxi Coking Coal Group,Linfen,Shanxi 031400,China)
机构地区:[1]山西焦煤集团霍州煤电辛置煤矿,山西临汾031400
出 处:《自动化应用》2024年第5期221-223,共3页Automation Application
摘 要:针对传统煤矿供电系统无功优化调度技术的局限性,介绍了一种全局无功优化调度技术方案。该技术方案在标准遗传算法的基础上,引入了算术交叉和启发式交叉思想,形成了改进多种群遗传算法。以某煤矿为研究案例,结合煤矿实际情况,通过算例分析方法进行工程应用,确认了改进多种群遗传算法具有收敛速度快、节能降耗力度大等优势。Based on the limitations of traditional reactive power optimization scheduling technology in coal mine power supply systems,a global reactive power optimization scheduling technology scheme is introduced.This technical solution,based on the standard genetic algorithm,arithmetic crossover and heuristic crossover ideas are introduced to form an improved multi population genetic algorithm.Taking a coal mine as a research case,combined with the actual situation of the coal mine,the engineering application is carried out through the example analysis method,and then it is confirmed that the improved multi population genetic algorithm has the advantages of fast rate of convergence,large energy saving and consumption reduction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.193.189