检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李进平 LI Jin-ping
机构地区:[1]山西省水利建筑工程局集团有限公司,山西太原030006
出 处:《山西水利科技》2024年第1期10-12,19,共4页Shanxi Hydrotechnics
摘 要:TBM对不良地质围岩适应能力较差,遇到断层带处可能出现卡机情况,TBM的卡机处理费时、费工,成为制约TBM快速掘进的主要因素之一。对东山供水工程施工十一标双护盾TBM穿越F14断层时的卡机过程、地质条件、原因、脱困对策和工艺、脱困后的措施进行了详细地介绍和总结,可为类似工程提供参考。TBM has poor adaptability to unfavorable geological surrounding rocks.When crossing fault zones,the machine may get stuck.Dealing with this situation is time-consuming and labor-intensive,and is one of the main factors affecting the rapid excavation of TBM.The stucking process,geological conditions,causes,freeing measures and processes,as well as measures taken after freeing of the double shield TBM crossing the F14 fault in the 11th bid of the Dongshan Water Supply Project were detailed introduced and summarized,which can provide reference for similar projects.
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117