检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵东 Zhao Dong(Henan Energy and Chemical Group Yongmei Company Chensilou Coal Mine,Henan Yongcheng 476600)
机构地区:[1]河南能化集团永煤公司陈四楼煤矿,河南永城476600
出 处:《山东煤炭科技》2024年第3期20-24,共5页Shandong Coal Science and Technology
摘 要:针对mZ201工作面收尾及回撤期间受多条老巷影响,对工作面停采及收尾工作带来不利因素,通过分析工作面停采线与多条老巷的相互关系,合理确定上网停采线及设备回撤路线,降低了采面收尾及设备回撤期间的安全风险,提高工作面设备回撤效率,并有效保证了矿井的生产组织,为煤柱工作面过老巷收尾及设备回撤提供了参考方案。In view of the fact that the mZ201 working face is affected by multiple old roadways during the ending and withdrawal period,which brings unfavorable factors to the stop mining and ending work of the working face,the interrelation between the stop mining line of the working face and multiple old roadways is analyzed,and the online stop mining line and equipment withdrawal route are reasonably determined,reducing the safety risks during the ending and equipment withdrawal period of the mining face,improving the efficiency of equipment withdrawal in the working face,and effectively ensuring the production organization of the mine,which provides a reference scheme for the ending and equipment withdrawal of the coal pillar working face passes through the old roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145