检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨翼 YANG Yi(China Railway 21st Bureau Group Co.,Ltd.Yungui Railway Guangxi Co.,Ltd.,Nanning 530005,China)
机构地区:[1]中铁二十一局集团有限公司云桂铁路广西有限责任公司,南宁530005
出 处:《价值工程》2024年第10期106-108,共3页Value Engineering
摘 要:本文依托贵南高铁广西段某大桥项目,对该大桥连续梁施工过程实施监测,首先根据施工监测目的以及桥梁特点,确定了本项目的主要监测项目,在施工过程中通过监测值与计算值的实时对比分析,主要从线形监测和应力监测两个方面对梁桥进行施工控制,监控结果表明,整个线形控制以及张拉效果良好,为今后类似工程提供有益参考。This article relies on a large bridge project in the Guangxi section of the Guinan high-speed railway to monitor the construction process of the continuous beam of the bridge.Firstly,based on the construction monitoring purpose and the characteristics of the bridge,the main monitoring items of this project are determined.During the construction process,through real-time comparative analysis of monitoring values and calculated values,the construction control of the beam bridge is mainly carried out from two aspects:linear monitoring and stress monitoring.The monitoring results show that,The overall linear control and tensioning effect are good,providing useful references for similar projects in the future.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7