摘 要:阳澄湖隧道基坑工程具有土方开挖量大、地质条件差以及所处位置特殊,紧靠京沪高铁丹昆特大桥的特点,严重影响基坑开挖安全和开挖进度。工程设计采用分级放坡开挖,边坡采用网喷+土钉联合支护结合井点降水的开挖支护方案。针对基坑稳定问题,采用理正岩土软件对基坑边坡两个典型断面的整体稳定性、抗隆起稳定性和抗突涌稳定性进行验算。同时使用FLAC3D数值模拟软件对基坑开挖过程进行了模拟,对基坑开挖引起的地表沉降、边坡变形、塑性区开展等结果进行计算,验证了基坑施工的稳定性。The foundation pit engineering of Yangcheng Lake tunnel is characterized by large amount of earthwork excavation,poor geological conditions and special location,which is close to dankun super large bridge of Beijing Shanghai high speed railway,seriously affecting the safety and progress of foundation pit excavation.The engineering adopts the excavation by grading,and the slope adopts the excavation and support scheme of mesh spraying+soil nailing combined with well point dewatering.In view of the prominent problem of foundation pit stability,geotechnical calculation software Lizheng is used to check the overall stability,anti uplift stability and anti surge stability of two typical sections of foundation pit slope.At the same time,the process of foundation excavation was also simulated by using FLAC3D numerical simulation software.The results of surface settlement,slope deformation and plastic zone development caused by foundation pit excavation are calculated to verify the stability of foundation pit construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229