检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Fei Dai Feng Wang Wenjuan Guo Ruijie Shi Shanglong Xin Xiaolong Liu Wuyun Zhao
机构地区:[1]College of Mechanical and Electrical Engineering,Gansu Agricultural University,Lanzhou 730070,China [2]School of Cyber Security,Gansu University of Political Science and Law,Lanzhou 730070,China
出 处:《International Journal of Agricultural and Biological Engineering》2024年第1期99-108,共10页国际农业与生物工程学报(英文)
基 金:the National Natural Science Foundation of China(Grant No.52065005);Outstanding Youth Foundation of Gansu Province(Grant No.20JR10RA560);Longyuan Youth Innovation and Entrepreneurship Talent Project in Gansu Province(Grant No.2022LQGR79).
摘 要:In view of the problems in operation process of fixed rake-type residual recycling component,such as poor individual profiling effect in film picking,easy clogging of the compound of films,soil and corn stubbles,high power consumption in film picking,and strong disturbance to seedbed soil,in this study,an operation model of intermittent filmpicking on full-film mulched double ditches was proposed and an intermittent film picking component was designed.The DEMMBD coupled algorithm was adopted for numerical simulation on the operation process of the intermittent film-picking component on full-film mulched double ditches,and a comparative analysis was carried out on the seedbed disturbance effect and resistance variation characteristics in film-picking by fixed and intermittent film-picking components.By taking the forward speed in film-picking,cam arrangement angle of the film-picking component and rotating speed of the cam shaft as independent variables,film-picking rate as the response value,a mathematical model between test factors and the film-picking rate was established,to explore the influence order of the factors on film-picking rate,and the optimal working parameters of the intermittent film-picking component were obtained as follows:the forward speed in film-picking was 2 km/h,cam arrangement angle was 180°,rotating speed of the cam shaft was 120 r/min.Under the optimal parameter combination,the average film-picking rate of the simulation test was 96.1%.Field test showed that,the average film-picking rate of the intermittent film-picking component was 95.6%,and 0.5%higher than that of the simulation test.The working condition of the sample machine was basically consistent with the simulation process,and can accurately represent the operation mechanism of intermittent film-picking on full-film mulched double ditches,showing that the established discrete element simulation model and its parameters were accurate and reasonable.
关 键 词:full-film mulched double ditches residual film recovery intermittent film-picking component DEM-MBD parameter optimization
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.93.141