检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王小华 WANG Xiaohua(Sinohydro Bureau 16 Co.,Ltd.,Fuzhou 350003,China)
机构地区:[1]中国水利水电第十六工程局有限公司,福建福州350003
出 处:《中国水能及电气化》2024年第3期26-31,5,共7页China Water Power & Electrification
摘 要:构皮滩水电站第三级垂直升船机是国内外规模最大的卷扬垂直提升下水式升船机,塔柱顶板具有施工高度大、跨度大、结构体型复杂、安全风险大等施工特点,采用的支撑结构体系,是保证塔柱顶板高质量、安全施工的关键。文章对构皮滩水电站第三级升船机塔柱顶板支撑系统的设计与应用进行了介绍,供类似工程施工参考。The third-stage vertical ship lift at Goupitan Hydropower Station is the largest hoisting vertical submersible ship lift in terms of scale both domestically and internationally.The tower’s top plate features significant construction characteristics,including a large construction height,wide span,complex structural configuration,and high safety risks.The support structure system employed is crucial for ensuring the high-quality and safe construction of the tower’s top plate.This paper provides an introduction to the design and application of the top plate support system for the third-stage ship lift tower at Goupitan Hydropower Station,serving as a reference for similar construction projects.
分 类 号:TV642[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.193